Motoryzacja

Manufacturing line for gear box cases

Location
Tianjin / China

Scope
Mechanical and electrical installation, of a interlinking loading/unloading system for a manufacturing line

  • Assembling of the conveyors at the end customer plant
  • Assemble and installation of the gantry system
  • Installation of the movable robots on the gantry system
  • Installation and leveling of the conveyor system
  • Electrical and pneumatic installation of the whole system
  • Start up support


Duration
5 month with interruptions between

Challenges
Installation in several steps
Installation during production


Four-point Cutting Press

Location
Valenciennes / FRANCE

Scope
Transport, mechanical assembly and electrical installation of a four-point cutting press

  • Bringing in
  • Mechanical assembly
  • Precision leveling
  • Electrical installation
  • Commissioning assistance


Duration
2 Months

Callenges
Coordination of bringing in the press of 370 tn. weight


Tyre Plant

Location
Camacari / BRAZIL

Scope
Mechanical assembly and electrical installation of a calender line for a tyre plant

  • Bringing in
  • Mechanical assembly
  • Precision leveling
  • Electrical installation
  • Piping
  • Commissioning assistance


Duration

7 Months

Challenges
Shortage in availability of special tools and equipment in the local market required high flexibility in work preparation